Riskmanagement

The main goal of our project, explained in the previous chapters, is to do an evaluation, a social and technical research. However, there is a chance that due to unforeseen circumstances we cannot successfully reach this goal.

noun_81681_cc.png

The crucial points where the project may fail or delay are summed up:

-          Bad contact with local people

-          No student enthusiasm from the university

-          No bamboo prepared

-          The model house is in bad condition and not safe to enter

-          No planning: ‘mañana, mañana, mañana’.

Therefore we have drafted plan B and C, which are back-up plans for if we cannot carry out our plan A.

Plan B focuses on the roof design of the social house. Currently it is made out of corrugated sheets of tin but Bambú Social aims for a roof made out of local and sustainable products. There are already several plans for a sustainable roof made out of ferro-cement applied over bamboo rods. In plan B we will test this plan to find out if it is a good solution for the current roofing problem.

In plan C we will join Henky Borgstein in his research and investigate the possibility of a dome construction. This dome will function as the main supporting construction on to which the floor and walls are attached in such a way that they hang.